#
30.12.2020

BIM_AP - Cooperative BIM Implementation Project

Recognizing the importance of BIM (Building Information Modeling) and considering the increasing digitalization of all industries, various specialist planners have joined forces in this consortium for a tailored qualification to develop a cooperative openBIM execution plan (AP).
blurhash AI-generated image
 
 
A joint specification for openBIM, a joint project execution plan (BEP/PAP), and joint employer's information requirements (EIR/EIR) are the planned deliverables of this collaborative project.
 
Organization and coordination by ecoplus Construction.Energy.Environment Cluster Lower Austria
 
 
The project aims to define interfaces within the project team using a fictitious construction project and to practice data exchange in openBIM. This will optimize the planning process and allow the time saved to be invested in the quality of the concepts, projects, and workflows.
 

External Experts: 

 
SIDE Studio for Information Design GmbH 
 

Project Partners:

 
  • Ing. René Schmied MBA – das leitwerk
  • POPPE*PREHAL ARCHITEKTEN ZT GmbH
  • Sepp Leitner Bautechnik GmbH 
  • zieritz + partner ZT GmbH 

 

Project Period: October 1, 2018 to October 31, 2020 

Using concrete case studies, the presented methods will be applied outside of a competition, thus deepening knowledge with a strong practical focus.
 
3d Form im Hintergrund
3d Form im Hintergrund
3d Form im Hintergrund
3d Form im Hintergrund
3d Form im Hintergrund
3d Form im Hintergrund
3d Form im Hintergrund
3d Form im Hintergrund
3d Form im Hintergrund
3d Form im Hintergrund